
Bridges & Civil Works · 11
Amochu Bridge, Bhutan
Phuentsoling ( Tabaramtey on P’ling-Samtse highway) Bridge Length: 175m (Longest at the time of construction) Main Span: 140m (Longest span at the time of construction in Bhutan) Type of Bridge: Semi-through Parabolic 3D steel tube arch, cable suspended, composite deck (Precast panels + CIS Topping) Method of Construction: Temporary steel towers, cables, hoist & steel segment joining (arch first – followed by deck) Design Duration: 6 Months (including topo and soil investigation)
Amochu Bridge, Bhutan — a bridges & civil works project engineered by CivilPark International.
- Location
- Phuentsoling ( Tabaramtey on P’ling-Samtse highway) Bridge Length: 175m (Longest at the time of construction) Main Span: 140m (Longest span at the time of construction in Bhutan) Type of Bridge: Semi-through Parabolic 3D steel tube arch, cable suspended, composite deck (Precast panels + CIS Topping) Method of Construction: Temporary steel towers, cables, hoist & steel segment joining (arch first – followed by deck) Design Duration: 6 Months (including topo and soil investigation)
Next project
Ngabi Rongchu Bridge, Bhutan