Infrastructure

Bridges, expressways, stadiums and water works — the crossings and civil structures that connect Thailand, Nepal, Bhutan, Qatar and beyond.

Banpai-Nakhon Phanom Railway, Thailand
01

Banpai-Nakhon Phanom Railway

romklao
02

Romklao-Thap Chang Bridge

Kaligandaki River Bridge, Nepal
03

Kaligandaki River Bridge, Nepal

Bagna-Chonburi Expressway, Thailand 
04

Bagna-Chonburi Expressway, Thailand 

The Pearl Doha Bridges Qatar 
05

The Pearl Doha Bridges Qatar 

Doha CPI’s Client: PBL Thailand (Prestressed concrete D+B contractor) Our Scope: Structural design independent review of over 32 Bridges (new city on fully reclaimed land)  

Infrastructure — collection cover
06

Sunkoshi River Bridge@ Khurkot, Nepal

Sunkoshi Bridge @ Pauwa Bandeu, Nepal
07

Sunkoshi Bridge @ Pauwa Bandeu, Nepal

Jhyadhi River Bridge @ Daduwa, Nepal
08

Jhyadhi River Bridge @ Daduwa, Nepal

Kathmandu-Tarai Expressway Project, Nepal
09

Kathmandu-Tarai Expressway Project, Nepal

Mekong River Island Bridge, Cambodia
10

Mekong River Island Bridge, Cambodia

Phnom Penh Client: Canadia Bank Span Layout: 100+250+100 = 450m Bridge Type: Cable-stayed (Two pylon, single plane cable, 6 lane roadway & composite deck)  Design Duration: 5 Months Our Scope: Structural Design  

Amochu Bridge, Bhutan
11

Amochu Bridge, Bhutan

Phuentsoling ( Tabaramtey on P’ling-Samtse highway) Bridge Length: 175m (Longest at the time of construction)  Main Span: 140m (Longest span at the time of construction in Bhutan)  Type of Bridge: Semi-through Parabolic 3D steel tube arch, cable suspended, composite deck (Precast panels + CIS Topping) Method of Construction:   Temporary steel towers, cables, hoist & steel segment joining (arch first – followed by deck)   Design Duration: 6 Months (including topo and soil investigation)   

Ngabi Rongchu Bridge, Bhutan
12

Ngabi Rongchu Bridge, Bhutan

Shemtokha Rongchu Bridge, Bhutan
13

Shemtokha Rongchu Bridge, Bhutan

Babesa, Thimphu (Thimphu-Babesa Expressway)  Main Span: 45m  Bridge Type: Twin deck variable depth post-tensioned box girder integral frame bridge, variable section box piers and first PT bridge in Bhutan  Duration: Design 6 months + construction supervision 2 years (3 bridges) Our Scope: Full fledge structural design + construction supervision 

Gelposhing Bride, Bhutan
14

Gelposhing Bride, Bhutan

Gelposhing Main span: 60m Reason for Bridge: Very risky site, vey close to deep and fast flowing river Bridge Type: CIS PT box girder (supported by conventional scaffolding)  Scope: Schematic design and overall cost for government budgeting 

Khur Kuenphen Bridge, Bhutan
15

Khur Kuenphen Bridge, Bhutan

Guruthang-Bajo Main span: 100m Bridge Type: Haunched-single-span box (HSSB) system MoC: CIS segmental cantilever construction over the river with counterweight on hill side (abutment) 

Chukha Hydro Bridge, Bhutan
16

Chukha Hydro Bridge, Bhutan

Manas River Bridge, Bhutan
17

Manas River Bridge, Bhutan

Eastern Bhutan (Manas National Park) Main span: 90m Total length: 140 m Bridge Type: Steel Truss Arch with steel frame piers & rock foundation Our Scope: Conceptual Planning & Design Design + Drawings

Thimphuchu Bridge, Bhutan
18

Thimphuchu Bridge, Bhutan

Thimphu Main span: 75m Bridge Type: Steel Truss Arch (Triangular shaped), MS Flat bar hangers, PT deck and longitudinal girders Our Scope: Independent Review and PT Specialist

Water-treatment Plant, Laos
19

Water-treatment Plant, Laos

Dongmarkhay, Vientiane Client: Water Supply Authority (WASA), Lao  Duration: 1 Month Our Scope: Structural Design/Review of full-fledged modern water treatment plan 

Water Works for NHA, Thailand
20

Water Works for NHA

Nawanakhorn, Pathumthani Owner: NHA – National Housing Authority Client: Summit Grade Partnerships Limited, Thailand Project Size: Originally 600 – 5 story flats (each 2,000 sq. m. floor area – 45 family unit/bld) Largest residential complex but later reduced to about 200 buildings Precast large panel system for building (main structure finish within 1 month) Water-Work: Water-supply, Drainage System, Treatment Plant, Flood Retention System, etc. Duration: 6 Months Our Scope: Full package structural + water work design

Dragon Solar Park/Mitrpol Stadium, Thailand
21

Dragon Solar Park/Mitrpol Stadium

Ratchaburi Client: Ratchaburi F.C. Purpose: Football stadium, used for football matches. Capacity: 10,000 seats

Guru Rimpoche Statue, Takila, Bhutan
22

Guru Rimpoche Statue, Takila, Bhutan