Romklao-Thap Chang Bridge

Location: Bangkok (Cross Inter-state Motorway near Suvarnbhumi airport) Owner: Bangkok Metropolitan Authority Design Duration: 4-5 Months Method of Construction: Main span – CIS segmental balanced cantilever Back spans: conventional (single casting on scaffolds) Our Scope: Structural design/VE of the main bridge (300m) Bridge Length: 800m (Twin-deck) Span Layout: 85+130+85 (m) Type of Bridge: Post-Tensioned Box Girder