
Bridges & Civil Works · 06
Sunkoshi River Bridge@ Khurkot, Nepal
Sunkoshi River Bridge@ Khurkot, Nepal — a bridges & civil works project engineered by CivilPark International.
- Client
- Midhill highway project, government of Nepal Location: Khurkot (Connecting Ramechhap and Dolakha district) Span Layout: 47+120+120+47 = 334 m Type of Bridge: Extra-dosed (single pylon with CIS segmental PT box deck) Design Duration: 3 Months (including topographic survey and hydrological study) Proposed Method of Construction: Balanced cantilever Our Scope: Structural schematic design and budget estimation for D+B bid
Gallery — 1

Next project
Sunkoshi Bridge @ Pauwa Bandeu, Nepal